Result
Operational planning running in parallel with the construction planning
The Oskar Reinhart Collection “Am Römerholz” is presented to visitors in unique surroundings and rooms with a unique atmosphere. It is one of the most important private collections of the 20th century. It comprises some 200 works of European art from the late Gothic period to the threshold of classical modernism. The floor area is 3’053 m2 and has about 34’800 visitors per year. In addition to the areas designed for exhibitions, rooms for concerts / events, readings, lectures and a museum café are available to guests on site.
As part of the renovation, significant improvements were made to the climatic and safety systems. Some logistical improvements were achieved by adapting the premises. For the modernization of the complex structure, the structural planning had to be coordinated with the operational planning. The parallelism of operational planning with construction planning required the following objectives:
Intep was commissioned to support the project owners in the operational planning. In this context, it is essential that intep takes over the coordination and implementation of the tasks arising from the operational planning in terms of content and organisationn.
Creation of the operational planning resp. concept
Creation of the evacuation manual